2006/2007:
Cast:ing (Germany):
Sourcing of stainless steel and aluminium casting parts. Handling the complete local part from negotiation the contract with supplier, Expediting, quality control, packing and transport. Performing the pressure test of the casting parts.
Mechanik Center (Siemens Germany):
Xingren-Shenzhen; supply of welder with complete equipment for welding stainless steel pipes under extreme difficult conditions.
The complete set of welding equipment was supplied to site with satisfactory pressure test.
FlowPro (Netherland):
Expediting and quality control of steel parts for the ventilation system of the subway at London Heathrow Airport
Steel parts welded, zinc coated, preassembled in the workshop, check and handles the packing and transport ex works.
2006:
COGNIS Chemical(Germany/China):
Supervision inspector for extension of existing plant, specialised in erecting work, vibration reduction, and welding inspection of stainless steel pipes and flanges..
COGNIS Chemical(Germany/China):
Analysing the piping plans, to select the right valves for the complete system, close work with the German Klinger-Schoeneberg GmbH, sales headquarter in Idstein.
DaimlerChrysler (D):
Beijing Benz-Daimler Chrysler Plant; Assembly and pre-erection of motor assembly equipment for the production line of motors and axles for Mercedes C-Class.
Siemens(Germany):
Beijing Benz-Daimler Chrysler Plant: Installation of BESTA air pressure system for the production line of the Mercedes C-Class, including erection, assembly
Siemens (Germany):
Beijing Benz-Daimler Chrysler Plant at Beijing: Design and release by Chinese design institute, delivery and assembly of steel work for assembly lines, with a special rope handing system. All equipment fixed on the hanging steelwork, like air pressure system, adjustable lamps, measuring and installation equipment, emergency stops. Design, delivery and assembly of the light tunnel system for final check of the cars, including assembly of special lamps.
2004/2005
Merritt Group PLC (UK):
Handling the erection of press machine, unloading with high weights, foundation, lining, erection and installation of power
BESTA GmbH (Germany):
In Changchun FAW Plant, for companies like AFT, Fredenhagen and Siemens; installation of BESTA air pressure system of air pressure system at VW / China, incl. connecting to existing piping system, pressure test, installation of work stations, close working with the German project manager of VW (Germany), Mr. Mehrig
KLINGER (Germany):
SMS-DEMAG, Mr. Eiermann; SMS Head Office of Stainless Steel Works in Shanghai
KLINGER (Germany):
In Jiayuguan, JISCO, change of valve sealing in oxygen and nitrogen support lines, preparing the required tools and cleaning liquids, disassembly the valves, replace sealing, reassembly, installation to the stainless steel pipe system, assembly of actuators, calibrating, and handover with pressure test to customer
Delker (Germany):
Sourcing of high quality tools in China, under extreme time pressure
HYDAC (Germany):
Sourcing of forged parts used in hydraulic pressurised equipment. |
| |
|